Page Two of the Santa Ana Street track and tie replacement project for the UP branchline.
Click here to return to PAGE 1
Santa Ana Street Track Replacement Project:
11/24/04
The construction crew was working at Lemon Street on November 24. This is the location of the famed wig-wag signal. Here is a photo of the wig wag signal and the stopped ballast regulator at Santa Ana Street and Lemon Steet. This is a veiw looking east as the ballast regulator makes its way down the section of new rail. The ballast regulator driver hops back in and starts up the machine.
The ballast regulator driver hops back in and starts up the machine.
This is a veiw looking east as the ballast regulator makes its way down the section of new rail.
The construction crew was working at Lemon Street on November 24. This is the location of the famed wig-wag signal.
Here is a photo of the wig wag signal and the stopped ballast regulator at Santa Ana Street and Lemon Steet.
One of the formen suporvises the work as it progresses. Another man on the work crew scoops loose ballast back onto the row as the small street sweeper is powered up behind. The tractor dumps ballast as the ballast regulator moves to quickly spread it out.
The ballast regulator speeds past the camera as a forman supervises the movement.
One of the formen suporvises the work as it progresses.
Another man on the work crew scoops loose ballast back onto the row as the small street sweeper is powered up behind.
The tractor dumps ballast as the ballast regulator moves to quickly spread it out.
One of the many UP trucks that were on the scene during the construction period.
Another photo of the ballast regulator and the wig wag signal just after sunset. Welders in progress
Welders in progress Welders in progress
Another photo of the ballast regulator and the wig wag signal just after sunset.
A few photos of the crew as they work on getting a weld to take on a signal relay switch. There was a slight delay in the progress of the ballast work because the weld was not taking correctly.
Another photo of the ballast regulator and the wig wag signal just before sunset.
Another photo of the ballast regulator and the wig wag signal just before sunset.
12/01/04
A close up photo of the rail being placed on top of the tie clips Making some fine adjustments to the rail position. Just east of the rail being layed, another section was being built. This time they were laying ties.
The ties were laid out and then a long section of rail was dragged the distance and laid on top
Just east of the rail being layed, another section was being built. This time they were laying ties.
The ties were laid out and then a long section of rail was dragged the distance and laid on top A close up photo of the rail being placed on top of the tie clips
Making some fine adjustments to the rail position.
The rail is measured by two workers. They measured the length and spacing, made a few more adjustments with the Cat and then started on the rail with rubber mallats. The ties are dumped or pulled off the fork-lift attachment on the Cat. And the pincher tools also are used to evenly place the ties.
The rail is measured by two workers. They measured the length and spacing, made a few more adjustments with the Cat and then started on the rail with rubber mallats.
And the pincher tools also are used to evenly place the ties.
The rail is measured by two workers. They measured the length and spacing, made a few more adjustments with the Cat and then started on the rail with rubber mallats. The ties are dumped or pulled off the fork-lift attachment on the Cat.
Completed track, ties and panels at Santa Ana Street and Ohio Street Completed track, ties and panels at Santa Ana Street and Resh Street. Completed track, ties and panels at Santa Ana Street and Indiana Street.
Completed track, ties and panels at Santa Ana Street and Resh Street.
Completed track, ties and panels at Santa Ana Street and Ohio Street Completed track, ties and panels at Santa Ana Street and Indiana Street.
12/06/04
A view from my truck of the completed track, ties and panels at Santa Ana Street and Anaheim Blvd after the weekend blitz of work that took place.
And another view from the other side. Looking west towards Anaheim Blvd. I am standing in front of Reel Lumber (to my right)
Compelted track, ties and panels at Santa Ana Street and Claudina Street. All that was left was to fill in the edges with asphalt.
Compelted track, ties and panels at Santa Ana Street and Claudina Street. All that was left was to fill in the edges with asphalt. And another view from the other side. Looking west towards Anaheim Blvd. I am standing in front of Reel Lumber (to my right)
A view from my truck of the completed track, ties and panels at Santa Ana Street and Anaheim Blvd after the weekend blitz of work that took place.
12/08/04
This photo is looking West towards Manchester Blvd. Looking east over the old rail still in place before replacement had taken place.
After everything east of West Street was completed they came back and replaced a small section just east of the 5 freeway overpass. They assembled the track section right on the vehicle overpass.
After everything east of West Street was completed they came back and replaced a small section just east of the 5 freeway overpass. They assembled the track section right on the vehicle overpass. This photo is looking West towards Manchester Blvd.
This photo is looking Northwest across Santa Ana Street.
Looking east over the old rail still in place before replacement had taken place.
12/13/04
Two final photos of the installed rail, ties and panels leading to the 5 freeway overpass. Two final photos of the installed rail, ties and panels leading to the 5 freeway overpass.
Two final photos of the installed rail, ties and panels leading to the 5 freeway overpass.