Olive Street:
|
|
|
|
In addition to the street running the UP Anaheim switch jobs do on Santa Ana Street, they also have a short run down the south end of Olive Street which ends at Vermont Road as the ROW continues on to Ball Road.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UP 588 with a large Marlboro switcher making the transition from Santa Ana Street to Olive Street
|
|
|
|
UP 588 with a large Marlboro switcher at South and Olive Street.
|
|
|
GMTX 2146 leading the Marlboro switcher north on Olive Street at Vermont.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UP 603 leading a south bound Costa Mesa switcher along Olive Street on a foggy morning in March 2007
|
|
|
|
UP 625 and SP 2756 working the Marlboro local back before RCL operations began.
|
|
|
|
UP 625 and SP 2756 working the Marlboro local back before RCL operations began.
|
|
|
|
|
|
|
|
|
|
|
|
The tail end of a Marlboro Switcher heading down Olive Street. Just about to run out of street trackage as they are crossing Vermont.
|
|
|
UP 1089 dragging a sled, Geep and a nice cut of empty cars up Olive Street as the Marlboro Swticher heads back to West Anaheim.
|
|
|
|
UP 1065 coming up Olive Street leading the Marlboro Switcher running light back to West Anaheim yard in May 2007
|
|
|
|
|
|
|
|
|
|
|
|
UPY 1115 with it's former SP heritage showing proudly under some yellow patching starts into the curve off Olive Street that leads to Santa Ana Street.
|
|
|
UPY 2723 on the point of a late running Marlboro Switcher captured here with a pan shot as they start over to Santa Ana Street with their run back to West Anaheim.
|
|
|
UPY 1144 running no hood first up Olive Street with the days Marlboro Switcher as Mr. Jeff Bass captures an image up ahead of me.
|
|
|
|
In May of 2006 the Union Pacific replaced the ties and rails that run up the middle of Olive Street. Here are some images that I captured during that time period.
|
|
|
|
|
|
|
|
|
|
|
|
UPY 1115 was the last train to use this stretch of old track as it brought the Marlboro Switcher back the evening before the construction started.
|
|
|
The first section of track replacement on Olive Street started north of the South Street crossing since the crossing had already been replaced during a previous project.
|
|
UPY 1115 was the last train to use this stretch of old track as it brought the Marlboro Switcher back the evening before the construction started.
|
|
|
|
|
|
|
|
|
|
|
UP MOW crew doing some quick finish up work on this first new section as the days Marlboro Switcher was asking for permission to travel to South Anaheim with their train.
|
|
|
|
UP MOW crew doing some quick finish up work on this first new section as the days Marlboro Switcher was asking for permission to travel to South Anaheim with their train.
|
|
|
UP MOW crew doing some quick finish up work on this first new section as the days Marlboro Switcher was asking for permission to travel to South Anaheim with their train.
|
|
|
|
|
|
|
One quick pass over by the ballast regulator before he runs south to clear the main at Weyhauser so the Marlboro can test out the new track for them.
|
|
|
|
Finally clear to pass, the UPY 1206 leads the days Marlboro Switcher onto Olive Street as the first train to use this new section of rail.
|
|
|
|
One quick pass over by the ballast regulator before he runs south to clear the main at Weyhauser so the Marlboro can test out the new track for them.
|
|
|
|
|
|
|
|
Finally clear to pass, the UPY 1206 leads the days Marlboro Switcher onto Olive Street as the first train to use this new section of rail.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|